top of page
Financial Report

Real-time Information Management and Decision Support System

EkoSource specialises in developing information management systems (IMS) which assist with the operational planning and management of water infrastructure. These services have been shown to reduce losses and improve delivery on systems where they have been implemented. These services include:

  • Near real-time reservoir release management systems for low flow optimisation

  • Near real-time release optimisation, flow management and compliance auditing

  • Water ordering, release optimisation and water use auditing

  • Near real-time flood forecasting and management services

  • Water resources information management systems

  • Integrated Decisions Support Systems

  • Alliance for Water Stewardship Standard

NIWIS.png
City of Cape Town Decision Support System

Development   of a Decision Support System for the Bulk Water Division of City of Cape   Town. This involved the setup of numerous water distribution system models,   development of data capture systems which included their bulk water treatment   facilities, as well as plant operators, and technicians. A set of management   dashboards has been developed to enable management to effectively understand   and engage with the system.

Client

South Africa

Duration

Aurecon/Zutari/City of Cape Town

South Africa

2019 - Present

NIWIS.png
SANSA Satellite Dams Calculator

The National Water Quantity (NWQ) information provided to the South African National Space Agency (SANSA) is generated using pre-existing data modelling procedures developed and operationalized jointly by GEOTERRAIMAGE SA (www.geoterraimage.com) and EKOSOURCE (www.ekosource.co.za) . The application of these new technology developments has resulted in a new product being developed which enables the estimation of dam volumes at a quaternary catchment level. These include the assessment of the volume of all small dams and medium dams that are not monitored by DWS on a continuous basis.

Client

South Africa

Duration

South African National Space Agency (SANSA)

South Africa

2019 -2022

NIWIS.png
Umngeni WRM Software Update and Maintenance

Continued support for the Umngeni Water Water Resource Management System, update and maintenance of the system.

Client

South Africa

Duration

Umngeni-Uthukela

South Africa

2021 - 2022

NIWIS.png
Inkomati - Usuthu CMA Technical Support

Provide specialized software support for DHI Mike customized software package subscription and maintenance on short term decision support system (DSS) Model upgrade and improvement on an as required basis for the period of one years.

Client

South Africa

Duration

Inkomati - Usuthu CMA

South Africa

2021 - 2022

NIWIS.png
Implementation Support Consultancy for Water Resources Planning and Management for the Kenya Ministry of Water and Irrigation

Development of water resource Information Management system using MIKE INFO platform for the Water Resource Authority. The system allows data capturing, data analysis and information dissemination to stakeholders and public. The system was deployed in the 26 sub-region, 6 region offices and WRA headquarter.

Client

Kenya

Duration

World Bank, Kenya Water Resource Authority

Kenya

2018 - 2019

NIWIS.png
Upgrade of Umngeni WRMDSS

Convert  the Umngeni Water Resources Management Decision Support System from an outdated database structure and outdated front end Graphical User Interface to a new system with better database structure, updated user controls and updated user interface.

Client

South Africa

Duration

Umngeni-Uthukela

South Africa

2021

NIWIS.png
Development of a flood disaster mitigation plan and Early Warning Flood Forecasting System for Umgungundlovu District Municipality

This project focussed on assisting Umgeni   Water in setting up a flood disaster mitigation plan and early warning system   for the Umgungundlovu District Municipality. The objective of the project was   to work with Umgeni in capacity building its staff to develop hydrological   and hydrodynamic models. The project focussed on setting up a set of models   to determine the hydrological hazard threat, then combined this with GIS   collected vulnerability estimates to determine areas of highest risk. This   was then combined with the Early Warning Flood Forecasting System which   integrated the models into an operational framework.

Client

South Africa

Duration

Umngeni-Uthukela

South Africa

2017 - 2020

NIWIS.png
Zambezi Water Resources Information System (ZAMWIS) Enhancement 3: Hydro-meteorological Database and Decision Support System

Main project features: The ZAMWIS-DSS project includes three main components: 1) The upgrade of the ZAMWIS Database, 2) The design and development of the ZAMWIS DSS, 3) Capacity building of the ZAMWIS-DSS

Client

Zambia

Duration

Sub consulted to DHI: Main client ZAMCOM

Zambia

2017 - 2019

NIWIS.png
Lower Inkomati Flood Risk Management and development of Early Warning system

This was a full flood risk assessment and development of a pilot system for the flood early warning on the lower part of the system. An integrated team was setup to investigate the options related to specific infrastructure interventions and economic impacts associated with these interventions. This study had a good success with findings being presented at Stockholm water week.

Client

South Africa

Duration

Climate Resilient Infrastructure Development Facility| CRIDF

South Africa

2016 - 2016

NIWIS.png
Provision of technical and maintenance support for the real time operational for IUCMA.

Development of an integrated system which enabled the collection of information from various data sources. This information is processed and presented in formats that will help decision makers. The system is able to integrate, and quality check data then publish the information onto the internet to inform the public and help decision makers.

Client

South Africa

Duration

Inkomati Usuthu Catchment Management Agency

South Africa

2015 - 2019

NIWIS.png
Shire River Basin Institutional Planning and DSS Support Consultancy, Malawi

Water Resources Management Consultancy in support of institutional establishment in Shire River Basin: Configuration of base case MIKE Hydro Basin model to be used in scenario analysis for water resources development scenarios

Client

Malawi

Duration

World Bank (Subcontracted to NIRAS)

Malawi

2015 - 2016

NIWIS.png
Provision of Hardware and Software Components to IWRMIS

The development of an integrated Water Resources Management Information System. This consisted of the development of an Information Management System to support WARMA in the implementation of the National Water Resources Management Act in Zambia. The system was set up to effectively capture and manage various water-based information and present these in a format that could be used to support decision making.

Client

Zambia

Duration

Water Resources Management Authority (WARMA)

Zambia

2015 - 2016

NIWIS.png
Limpopo Water Monitoring

Project initiated to set up a pilot proof   of concept early warning flood management system on the Limpopo catchment.   The system was setup using existing datasets and real time information. The   system ran successfully using only the hydraulics to monitor high flows down   the Limpopo system.

Client

South Africa

Duration

Climate Resilient Infrastructure Development Facility (CRIDF)

South Africa

2014 -2015

NIWIS.png
National Integrated Water Information System (NIWIS)

Established the National Integrated Water Information System to provide universal accessibility to required data and information for decision makers, and other stakeholders. By integrating existing diverse data sources, the project aimed at putting user-oriented reporting and analysis tools in the hands of the users.

Client

South Africa

Duration

Department Water and Sanitation: Information Systems

South Africa

2013 - 2018

NIWIS.png
CoCT WS-IMS Phase 2

Further development and refinement of the City of Cape Town Information management system. The system captured information from various sensors and presented it in a web-based format to support management decisions. This included flow and water quality information.

Client

South Africa

Duration

City of Cape Town

South Africa

2013 - 2013

NIWIS.png
Inkomati CMA Continued Support and Maintenance for the Real Time DSS

The further development and maintenance of the InKomati Catchment Decision Support System. The system runs in an automatically, coupling water quality, quantity and other measured information such as rainfall and water user into a combined modelling framework to optimise releases down the system.

Client

South Africa

Duration

Inkomati Catchment Management Agency

South Africa

2013 - 2013

NIWIS.png
Inkomati CMA Continued Support and Maintenance for the Real Time DSS

The further development and maintenance of the InKomati Catchment Decision Support System. The system runs in an automatically, coupling water quality, quantity and other measured information such as rainfall and water user into a combined modelling framework to optimise releases down the system.

Client

South Africa

Duration

Inkomati Catchment Management Agency

South Africa

2013 - 2013

NIWIS.png
CoCT WS-IMS Phase 2

Further development and refinement of the City of Cape Town Information management system. The system captured information from various sensors and presented it in a web-based format to support management decisions. This included flow and water quality information.

Client

South Africa

Duration

City of Cape Town

South Africa

2013 - 2013

NIWIS.png
Upper Zambezi: Establishment of a Monitoring Network and Flow Forecasting System: National Civil Protection Services and Firemen

Setup an early warning flood forecasting system on the upper Zambezi catchment using measured monitored data and rainfall information from Satellite. Develop a flood forecasting early warning system for the Moxico province in the Zambezi in Angola

Client

Angola

Duration

INOVA-Inovações e Projectos, Lda

Angola

2012 - 2014

NIWIS.png
Disaster Mitigation and Management Plan and Flow Forecasting System for the Benguela Province: National Civil Protection Services and Firemen

Establishment of a disaster mitigation plan and flow forecasting system for the Benguela river.

Client

Angola

Duration

INOVA-Inovações e Projectos, Lda

Angola

2012 - 2014

NIWIS.png
BHP BECSA Middleburg Mines: IMS development project

Set up an information management system as a pilot for the BECSA area. The system was set up to integrate various information sources into a single database.

Client

South Africa

Duration

AGES Gauteng

South Africa

2012 - 2013

NIWIS.png
The Umgeni Water WRMDSS (water resources management system)

The WRMDSS provides web-based data capture for geographically dispersed Umgeni Water offices. Data such as dam levels, river flow, wastewater treatment volumes, and rainfall is captured by staff on a daily basis. This data is then validated and stored in a central database at head office. Detailed web reports and automated email reports are generated and disseminated within Umgeni Water, displaying data such as historic reservoir trajectories, treatment plant intake and sales, reservoir levels, and tabular reports ready for quarterly reporting documents.

Client

South Africa

Duration

Umgeni Uthugela

South Africa

2011-2013

NIWIS.png
The Umngeni Water WRMDSS (water resources management system).

The WRMDSS provides web-based data capture for geographically dispersed Umngeni Water offices. Data such as dam levels, river flow, wastewater treatment volumes, and rainfall is captured by staff on a daily basis. This data is then validated and stored in a central database at head office. Detailed web reports and automated email reports are generated and disseminated within Umgeni Water, displaying data such as historic reservoir trajectories, treatment plant intake and sales, reservoir levels, and tabular reports ready for quarterly reporting documents.

Client

South Africa

Duration

Umngeni-Uthukela

South Africa

2011-2013

NIWIS.png
Development of the integrated annual and real-time operating rules for the Western Cape Water Supply System (WCSS)

Setup a decision support system for the Western Cape Water Supply System which was able to provide key information for the overall system integrating several different modelling frameworks. This enabled the models to run and automatically and inform users on the amounts to release to meet water demands as well as provide information on curtailment and restriction decisions.

Client

South Africa

Duration

Aurecon South Africa (Pty) Ltd/ DWS final client

South Africa

2011 - 2014

NIWIS.png
Development of Short-term Flood Forecasting System for Eastern Nile technical regional office

Development of a Flood forecasting system   for four sub-basins of the Eastern Nile basin. The FFS was developed on the   MIKE Operation platform to predict the flows at various locations of the four   sub-basins. The system will help ENTRO with early identification of possible   floods and taking appropriate measure to prevent the loss of lives.

Client

Ethiopia

Duration

ENTRO (Eastern Nile Regional Office)

Ethiopia

2019 - 2020

NIWIS.png
Development of the integrated annual and real-time operating rules for the Western Cape Water Supply System (WCSS)

An online decision support system was setup to assist in the improved management of the system. This integrated hydraulic models within a water resources modelling framework, in an operational system which optimised releases and provided early warnings on the Western Cape Water Supply System. Information was published to a set of management dashboards that were accessible over the internet.

Client

South Africa

Duration

Sub consulted with Aurecon: Main Client Department of Water and Sanitation

South Africa

2011 - 2013

NIWIS.png
Development of the integrated annual and real-time operating rules for the Western Cape Water Supply System (WCSS)

An online decision support system was setup to assist in the improved management of the system. This integrated hydraulic models within a water resources modelling framework, in an operational system which optimised releases and provided early warnings on the Western Cape Water Supply System. Information was published to a set of management dashboards that were accessible over the internet.

Client

South Africa

Duration

Sub consulted with Aurecon: Main Client Department of Water and Sanitation

South Africa

2011 - 2013

NIWIS.png
Technical Support and maintenance of the Crocodile River DSS Real-time Framework and Short-Term Model

Focus on the continued support and maintenance of the Crocodile River Decision Support System near real time system and modelling framework. This included the onsite and offsite maintenance as well as adding further functionality to the system as required.

Client

South Africa

Duration

Inkomati Catchment Management Agency

South Africa

2011 - 2012

NIWIS.png
Real Time Operational Centre

Design of a real time operations centre at DWA. Train people to run and use the modelling applications developed for the centres purpose.

Client

South Africa

Duration

Department of Water Affairs: WRPS

South Africa

2011 - 2011

© 2026 by EkoSource Insight.