Water Resources Management and Hydrological Assessments including Climate Change

Climate Change Assessment for Amatshe Anglo American
The objective of this study is to provide a broad scale climate change assessment on Rainfall, Air Temperature and Evaporation for the Amatshe project
Client
Country
Duration
Anglo American
South Africa
2021

Climate Impact Analysis for Lesego Platinum Mine Project
The objective of this study is to assess the suitability of the current flood lines.
Client
Country
Duration
OMI Solutions
South Africa
2021

Zambezi Water Resources Information System (ZAMWIS) Enhancement 3: Hydro-meteorological Database and Decision Support System
Main project features: The ZAMWIS-DSS project includes three main components: 1) The upgrade of the ZAMWIS Database, 2) The design and development of the ZAMWIS DSS, 3) Capacity building of the ZAMWIS-DSS
Client
Country
Duration
Sub consulted to DHI: Main client ZAMCOM
Zambia
2017 - 2019

Shire River Basin Institutional Planning and DSS Support Consultancy Malawi
Water Resources Management Consultancy in support of institutional establishment in Shire River Basin: Configuration of base case MIKE Hydro Basin model to be used in scenario analysis for water resources development scenarios
Client
Country
Duration
World Bank (Subcontracted to NIRAS)
Malawi
2015 - 2016

Flood and hydrological analysis: Fish River Catchment
The Fish River catchment in Namibia is an area of concern to the Government as it is a flood prone area having registered very high floods, causing extensive damage to the town of Mariental and the irrigation schemes downstream of Hardap Dam. Measures needed to be put in place to curb further damage as the catchment undergoes its natural flood cycle. The system was modelled, and various mitigation measures were analysed and suggested for the area.
Client
Country
Duration
Namibia Ministry of Agriculture, Water and Forestry
Namibia
2015 - 2015

Application of Mike Customised Real Time for Flood Prediction in the Inkomati CMA
This pilot project was used to develop a flood prediction system for the IUCMA using the Mike Operations software. The system was successfully implemented and ran flood forecasts on the Crocodile river system in the Inkomati catchment. It contains a predictive hydrological model as well as a hydraulic model integrated into a real time operational framework.
Client
Country
Duration
Embassy of Denmark South Africa
South Africa
2015 - 2015

Gamagara River Diversion
Investigation of Surface Groundwater Interaction of the Gamagara River. This was an investigation into the problems associated with Swallet formation in the Gamagara river and looking at detailed hydrological modelling to assess the downstream impact on the river system and look at various high level remediation options.
Client
Country
Duration
AGES Gauteng
South Africa
2014 - 2015

Water Availability Assessment for the Lunsemfwa Catchment
In this project an analysis was performed to determine if there was enough water to support an irrigation scheme in the upper Lunsemfwa Catchment in Zambia. The project was being developed by Nordzuker. The analysis yielded significant impacts on downstream users including the Lunsemfwa hydropower scheme and infrastructure interventions to ameliorate yield impacts were considered too expensive to support the irrigation water requirements.
Client
Country
Duration
Imagen Consulting Ltd./ Nordzuker
Zambia
2014 - 2015

Integrating climate Change in Water Resources in Zambia
A hydrological and water resources model was set up in the Kafue Catchment as a pilot to provide a framework for the understanding of the Impacts of Climate Change on the area.
Client
Country
Duration
KfW Banking Group, GIZ
Zambia
2013 - 2016

Integrating climate change in Water Resources
Project consisted of performing an initial development of the Information and Communication Infrastructure Strategy, an Operations and Maintenance strategy, Water balance calculations for the Kafue Catchment Pilot and Climate change simulations for the final Simulations in the Kafue Pilot Catchment.
Client
Country
Duration
GFA Consulting Group GmbH
Germany
2013 - 2015

Development of Hydrologically Correct DEM
Set up system to provide a full hydrologically corrected DEM for the entire Inkomati Catchment Management Agency. The requirement was to use detailed contour data to generate a DEM at high resolutions and then generate a corrected DEM river delineation, catchment delineation and calculation of dam volumes.
Client
Country
Duration
Inkomati Catchment Management Agency
South Africa
2013 - 2014

BHP BECSA Middleburg Mines: IMS development project
Set up an information management system as a pilot for the BECSA area. The system was set up to integrate various information sources into a single database.
Client
Country
Duration
AGES Gauteng
South Africa
2012 - 2013